Control optimization for data centers.
Your cooling plant and your on-site generation are held to setpoint by control loops. Optimize those loops and the same equipment delivers more capacity on less energy — nothing replaced, nothing new in the critical path.
There is money in your plant right now.
You do not need new equipment to find it. You need the loops you already own to hold their targets.
of loops underperform
The industry norm. Most have never been flagged — the room stayed cool and the unit stayed online.
industry PUE, flat for six years
The remaining points are not in new equipment. They are in how the plant is controlled.
controllers replaced
Every engagement begins read-only on your existing DCS, BMS or PLC. You see the number before anything changes.
Two systems decide what your site costs to run.
Pick the one closest to your critical path. Each has its own scope and its own two-week entry engagement.
Cooling loop optimization
Cooling is the largest controllable load on site. Optimizing the loops beneath it recovers energy and returns capacity you can fill with racks — no capital project.
- 01Chiller staging, CHW supply temperature, condenser water
- 02Differential-pressure reset — usually the largest single win
- 03CDU and liquid-cooling loops at high rack density
- 04Economizer changeover and free-cooling hours
On-site generation optimization
Turbines are three years out. Optimizing control on the units you have adds ramp rate, heat rate and availability in weeks — capacity you cannot buy on your timeline.
- 01Load acceptance and ramp rate under stepping IT load
- 02Emissions control that holds a permit without a derate
- 03Drum level and startup sequencing — the common trip paths
- 04Islanded operation, load sharing and black start
Outcomes you can put in front of finance.
Measured in units your CFO and your operations lead both recognize.
Two weeks to a number. Nothing changes until you say so.
Fixed scope, fixed fee. The deliverable is yours whether or not you go further.
Assess
We work from your historian and trend data — no downtime, no controller changes. You get a ranked loop inventory, quantified instability and the recoverable energy attached to each.
Optimize
Tuning validated across the full operating range, plus model-based control where the physics puts a loop beyond PID. Implemented with your team, on your change-control process.
Hold
Continuous loop-performance monitoring across the site or fleet. Tuning decays as equipment ages; monitoring is what keeps the savings after the engineers go home.
Forty years of the same control problems.
From power stations, treatment plants and process lines — where an unstable loop trips a unit. Client names withheld; full case studies on request.
Model predictive control on the duct burners and surrounding loops — with no capital upgrade — qualified the station for dispatch markets its ramp rate had locked it out of.
Years of random startup trips. Loop analysis isolated a misconfigured controller that armed only in a narrow band — and drove the drum straight into trip territory.
A two-minute deadtime meant PID never settled, so every downstream pump and blower short-cycled. Model-based control settled the flow — and the whole cascade settled with it.
Four decades focused on one discipline: process control.
Advanced process control since 1985 — the same discipline, now pointed at the two systems that set what your site costs to run.
- Neutral
We are not selling you equipment
We sit on top of whatever you run — Schneider, Johnson Controls, Siemens, Vertiv, Trane, a legacy PLC. A mixed fleet gets one consistent measure of loop performance, which no single manufacturer can offer.
- Non-intrusive
Nothing new enters the critical path
No competing controller, no rip-and-replace, no new hardware. Every recommendation returns to your team as a specific parameter change to review.
- Complementary
Your optimization platform works better on top of us
Optimization software sets the targets; the control layer beneath has to hold them. We make that layer stable and observable, so pilot savings reproduce across the fleet.
- Transferable
Your engineers keep the capability
The deliverable is documentation and skill, not dependency. ControlSoft has run formal process-control training for four decades — the intent is that your team can read the plant after we leave.
Show us your most difficult hall.
A two-week assessment tells you what your control layer is costing you, which loops to fix first, and what the fix is worth. If the numbers are not there, we will say so — and you keep the inventory either way.
