On-site generation optimization.
A new turbine is roughly three years out. Until one arrives, the only megawatts you can add are the ones you recover from the plant you already have — and control optimization delivers them in weeks, with no capital upgrade to the generating assets.
- MW/minRamp rate gained so generation follows a load that steps rather than glides
- Heat rateLess fuel per megawatt delivered, without touching the turbines
- AvailabilityLatent control faults found before a real load profile finds them
- Permit headroomCompliance held through transients instead of bought with a derate
Your generation sits inside the fault domain of your SLA.
A grid-connected plant leans on an infinite bus. An islanded plant leans on nothing — and the load it serves steps rather than ramps.
The loops we take responsibility for.
Gas turbines, reciprocating engines, fuel cells and balance of plant — on whatever DCS or PLC the package arrives with. Select a control point.
Ramp against what the plant can actually give you.
The instinct on a step load is to open everything and hope. We do the opposite.
On one plant, a fixed-rate heat-up routinely tripped the shared boilers feeding the rest of the site. We replaced it with multivariable control that fed live boiler capacity back into the ramp — as aggressive as the plant could support, backing off automatically when it could not.
Trips ended. Heat-up got faster. Coordinating demand against real-time capacity beat opening the valve and hoping — which is precisely the problem you are about to commission, with "turbine block" in place of "boiler."
The same discipline applies to emissions. A cascade strategy with layered limits and bumpless override lets the binding constraint take control cleanly, so the unit holds its permit through a transient instead of derating to feel safe.
Demand coordinated against live plant capacity: the block reaches the new load cleanly, as fast as it safely can.
This is the plant we have been tuning for forty years.
Sixty-plus U.S. power plant installations. Client names withheld; full case studies on request.
Control changes alone made a legacy plant fast enough for a market it couldn't reach
Model predictive control on the duct burners and surrounding loops, with no capital upgrade to the generating assets. The station qualified for day-ahead, real-time dispatch and ancillary services it had been too slow to bid into. Delivered in eight weeks.
The trip that only armed under conditions nobody had thought to test
Years of random startup trips, worked around by biasing the drum level setpoint rather than solved. Loop analysis across successful and failed startups isolated a misconfigured single-element controller that engaged only in a narrow band — and drove the drum straight into trip territory.
Holding a NOx permit through transients instead of derating to feel safe
A cascade emissions strategy on turbine water injection: feedforward on load, with NOx ppm, NOx lb/MWh and CO ppm as layered limits and bumpless override between them, so whichever constraint binds takes control without a bump at the handoff.
Bring us in before commissioning, not after the first trip.
The cheapest place to fix a control strategy is on paper. The most expensive is at 3 a.m.
Review
We read the control narrative, EPC controls scope, OEM package logic and your expected IT load profile, then hand back the loops that will bite you — ranked, before commissioning.
Design & commission
Cascade emissions strategy, load-acceptance and ramp logic, multi-unit load sharing — corrected before it is built, witnessed at factory acceptance, then tuned across the whole operating envelope.
Monitor
Continuous loop scoring on the generation plant, so degradation shows up as a number on a dashboard rather than as a trip during a training run.
Send us your control narrative.
Your EPC will hand you a plant that starts. We make sure it holds — through a 40 MW step, an ambient swing and a permit inspection. We are not the EPC and not the turbine OEM, which is exactly why the review is worth having.